Xellia Pharmaceutical ApS

 

Project: Xellia SA

Period: Okt. 2017 - now

Location: Amager, Denmark

Amount: 170,000,000 DKK

LBP Engineering is consulting engineers and is handling the Project and Construction Management, Supervision, HSE Management . LBP Engineering A/S Has prepared and managed the tendering phase and are present coordinating and managing the contractors and suppliers.

The project is an expansion of existing pharmaceutical freeze-drying production and is built as an independent 3-level building with a floor plan of 335 m2.

Amoung others the building contains of clean room, cold storage, equipment and for supporting the building SCADA, BMS and FMS.

AGC Biologics 

 

Project: CMC 6 Pack Fase 2

Period: Okt. 2017 - now

Location: Søborg, Denmark

Amount: 60,000,000 DKK

 

LBP Engineering A/S is participating in the project of expanding the production area. LBP participate in all of the phases of the project - from Conceptual Design to hand over of the project to the customer.

 

In the phase of design LBP Engineering A/S has focus on the users and the project wishes from the customer.

CMC Biologics A/S

 

Project: 2.000 liter SUB

Period: Feb. 2017 - Mar. 2017

Location: Søborg, Denmark

Amount: 2,000,000 DKK

 

Consulting and Project Management of 2000 liters SUB. We performed Contracting, planning of decommissioning activities, Construction Management, Supervision, HSE and Commissioning Coordination.

Decommissioning planning and design required mapping of utility, HVAC and electrical installations in existing and running production facilities.

Zealand Animal Feed AMBA

 

Project: New administration building

Period: Dec. 2016 - July 2017

Location: Odsherred, Denmark

Amount: 5,000,000 DKK

 

Consulting Engineers and Architects at the new 250 m2 administration building of Zealand Animal Feed AMBA's. LBP Engineering has designed a building with focus on good indoor climate and large window sections that ensure high natural light intensity.

CMC Biologics A/S

 

Project: Kill Capasity Expansion

Period: Sep. 2016 - Pending

Location: Søborg, Denmark

Amount: 3,100,000 DKK

 

Consulting Engineers at an expanding of process waste water "Kill". Participation in mapping of the wastewater quantities and future needs. Preparation of CD and BD is performed.

LBP Engineering has handled Supervision and Construction Management for the preparation of a tie-in plan, that has been implemented during the shutdown in April 2017.

CMC Biologics A/S

 

Project: Line V

Period: Aug. 2016 - Feb. 2017

Location: Søborg, Denmark

Amount: 37,000,000 DKK

 

Total-Consulting Engineers at Line V, an establishment of a new production line in an existing storage room with 175 m2 cleanroom facilities.

 

LBP Engineering handled the DD, DQ, commissioning, adjustments and conducted the review of the client’s protocols in the qualification phase.

 

The project participation and construction management scope are as for the 6 Pack project below.

Esbjergværket

 

Project: ESV3 - storage of wind energy

Period: Mar. 2016 - Oct. 2016

Location: Esbjerg, Denmark

Amount: 35,000,000 DKK

 

Consulting and Construction Management for Electrical, Automation, Instrumentation and Risk Assessment.

Implementation of a district heat exchanger in connection with a existing power plant, so that the wind energy can be accumulated, when the coal block is stopped due to wind turbine power generation.

Name protection

 

Project: Construction of a new antihaemophilia plant

Period: Nov. 2015 - Dec. 2017

Location: Kalundborg, Denmark

Amount: 1,500,000,000 DKK

 

LBP is responsible for Construction Management, Supervision, HSE Coordination and QC Management (validation and qualification), as well as representing the customer with 3 consultants on building, electrical, process electrical, automation and cleanroom packages.

Construction of a new antihaemophilia plant, which is an upgrade of the existing neighboring plant. 7,500 m2 distributed on 5 levels.

CMC Biologics A/S

 

Project: 6 Pack

Period: May 2015 - Jan. 2016

Location: Søborg, Denmark

Amount: 25,000,000 DKK

 

Total-consulting engineering at the 6 pack project. Covering all phases from Conceptual Design to delivery of 9 specialist packages: cleanroom, electrical, building automation, process electrical, ventilation, BMS, Clean & Black Utility, sprinkler and process equipment.

The Danish Prison and Probation Service

 

Project: Storstrøm Prison

Period: Aug. 2014 - Aug. 2016

Location: Nørre Alslev, Denmark

Amount: 1,000,000,000 DKK

 

Construction and Safety Management of the execution at the new high-security state prison on Nordfalster. The prison has a building area of approx. 35,000 m2 surrounded by a 1.6 km long perimeter wall, which encircles 170,000 square meters.

The construction project was divided into a total of 17 contracts and up to 350 craftsmen were employed at the construction site at maximum load.

EPAX A/S

 

Project: Project Highway

Period: May 2013 - July 2014

Location: Ålesund, Norway

Amount: 60,000,000 DKK

 

Project, Construction and Commissioning Management on an existing fish oil facility with 5 new tanks, pipe systems and walkways.

Name protection

 

Project: Rebuilding of pharmaceutical production on existing plant

Period: May 2013 – May 2014

Location: Kalundborg, Denmark

Amount: 350,000,000 DKK

 

Construction and Commissioning Management for rebuilding and construction of a pharma-ceutical production- and administration building to produce insulin. The facility is 32,000 m2.

EPAX A/S

 

Project: EPAX Validation

Period: Mar. 2012 – May 2013

Location: Ålesund, Norway

Amount: 60,000,000 DKK

HSE Coordination and process review of the entire plant. The existing installations was to be retrospectively qualified and validated, and the necessary documentation was prepared in order for the plant to be approved by the FDA.

UCB Farchim

 

Project: Project Edelweiss

Period: Dec. 2011 – July 2013

Location: Bulle, Switzerland

Amount: 180,000,000 €

 

Construction and Commissioning Management for building a pharmaceutical production - and administrations building. 20,000 square meters facility for production of cimzia.

Name protection

 

Project: New plant for pharmaceutical production

Period: Sep. 2011 – July 2013

Location: Kalundborg, Denmark

Amount: 875,000,000 DKK

 

Building consultancy and management of building a pharmaceutical production facility at 10,000 square meters.

EPAX A/S

 

Project: EPAX Omega3

Period: Jan. 2011 – Sep. 2011

Location: Ålesund, Norway

Amount: 100,000,000 DKK

 

Portfolio Manager for expansion of an Omega 3 production facility.

Biogen Idec

 

Project: LSM Project

Period: Jan. 2007 - July 2008

Location: Hillerød, Denmark

Amount: 2,000,000,000 DKK

 

Construction Management at a pharmaceutical production plant and administration building at 22,000 square meters.

Czajka Wastewater

 

Project: WCI Czajka Wastewater

Period: Jan. 2010 – May 2011

Location: Warsaw, Poland

Amount: 7,600,000,000 €

 

Montage and Start-up Management of a wastewater facility.

SEB Bank A/S

 

Project: SEB Bank A/S, HQ Denmark

Period: April 2008 – Oct. 2010

Location: Copenhagen, Denmark

Amount: 940,000,000 DKK

 

Construction and Enterprise Management for office and administrations domicil. The facility is 27,110 square meters.

 

The project organisation was established as a result of control of seven entreprises. Construction hearing, gardening raw construction, facades, electrical circuits, ventilation and security was controlled by LBP Engineering.

Vattenfall

 

Project: Fynsværket blok 8

Period: 2008 - 2009

Location: Odense, Denmark

Amount: 750,000,000 DKK

 

Inspection and Start-up Management of El enterprise. Automatic concept for burner and regulation technique plus stalk transportation.

Pronova Biopharma

 

Project: Kalomega

Period: Oct. 2007 – May 2009

Location: Kalundborg, Denmark

Amount: 300,000,000 €

 

Construction and Start-up Management of a fast track project for Kalomega, a 22,000 square meters production and administration facility.